Prefabricated Water-Cooled Chiller Plant Assembly for Xiamen Metro Line 6: 4 Stations Delivered and Accepted

2026-11-16

Latest Company Case About Prefabricated Water-Cooled Chiller Plant Assembly for Xiamen Metro Line 6: 4 Stations Delivered and Accepted

Project Overview

Xiamen Metro Line 6 is the first intercity metro line in Fujian Province, China, running approximately 59.27 km with 37 underground stations and connecting Zhangzhou with Xiamen. As a landmark piece of infrastructure for the Xiamen–Zhangzhou metropolitan area, its mechanical and electrical works demand partners who can meet metro-grade safety, quality and schedule requirements.

Item Details
Project Xiamen Metro Line 6 (Fujian, China)
Scope delivered Prefabricated assembly, installation and commissioning of water-cooled chiller plants
Stations covered Third Hospital Station, Duqiao Station, Houwu Station, Xihu Station
Supply and installation cycle Approximately 3 months
Current status Installation completed; acceptance essentially finished
Equipment supply Not included — prefabricated assembly service only


Our Role: Prefabricated Assembly, Not Equipment Supply

This project is a clear example of our prefabricated (modular) chiller plant service model. We did not supply the chillers or the main equipment. Instead, we took the client's equipment packages and delivered the complete prefabricated assembly works: all equipment, pipework, supports, valves and accessories were fabricated and pre-assembled in a controlled workshop, then transported to each metro station, positioned on site, installed, connected, pressure tested and commissioned.


Prefabrication workflow

  1. Design review and coordination — shop drawings, pipe routing and space checks against the station plant room layout.
  2. Workshop prefabrication — pipe spools, supports, manifolds and frames fabricated under controlled conditions.
  3. Pre-assembly and factory inspection — modules trial-fitted, dimensioned and checked before dispatch.
  4. Transport and lifting — modules protected, delivered to underground station access points, then lowered and moved into the plant rooms.
  5. On-site positioning and connection — modules set, levelled and connected to risers and headers.
  6. Testing and commissioning — pressure testing, flushing, water treatment, balancing and functional testing with the client.


Stations Delivered

  • Third Hospital Station 
  • Duqiao Station 
  • Houwu Station 
  • Xihu Station 

All four plant rooms were executed under one coordinated programme, so a single engineering team, a single quality standard and a single delivery schedule were applied consistently across the stations.


Results and Value Delivered

  • Three-month delivery cycle — from prefabrication mobilisation to completed installation and commissioning across four stations.
  • Accepted quality — acceptance work is now essentially complete, with no outstanding major defects.
  • Compressed site works — shifting fabrication into the workshop reduced on-site cutting, welding and hot work in confined underground plant rooms.
  • Better safety and housekeeping — less site debris, fewer open-flame operations and cleaner working conditions inside metro stations.
  • Schedule certainty — parallel workshop production allowed MEP handover to proceed without waiting for full site readiness.


Conclusion

For metro, hospital, data centre and large commercial projects where plant rooms are tight, access is difficult and handover dates are fixed, prefabricated chiller plant assembly is a proven way to shorten site time and improve quality consistency. This Xiamen Metro Line 6 delivery across four stations demonstrates our capability to prefabricate, deliver, install and commission water-cooled chiller plants to metro-grade standards — as an assembly partner rather than an equipment vendor.