Project |
Headquarters office building, Henan Engineering Design Innovation Park |
|
Location |
Zhengzhou, Henan Province, China |
|
Building type |
Government-affiliated office headquarters |
|
Conditioned area |
20,000 m² |
|
Installed cooling capacity |
3,000 kW |
|
System |
Screw-type water-cooled chillers plus split air conditioners |
|
Completed |
2019 |
|
Context |
Anchor building of a 126,000 m² design-industry park |
Zhengzhou sits in the middle of China, which means the HVAC design has to survive two very different seasons. Summer afternoons push past 35°C and stay humid; winter is dry and cold enough that heating is not optional. Spring brings dust. A building has to handle all three without becoming expensive to run in any of them.
The client was a design institute moving into a new headquarters: open-plan studios, drawing and review rooms, meeting floors, a canteen and public-facing reception areas. Roughly 20,000 m² needed to be held at a comfortable temperature, and the building had to work for a professional workforce that spends long days at a desk.
The brief was not unusual, and that is what makes the project useful to look at. Most office buildings in central China face the same combination: a large, fairly stable core load, a perimeter that swings with the sun, and a handful of rooms that are used at odd hours and need to be controlled separately.
The system is a hybrid, and deliberately so.
A central chilled water plant with screw-type water-cooled chillers, 3,000 kW in total. The bulk of the building — studios, open floors, meeting areas — runs off central chilled water. Water-cooled screw machines were the right fit for the load profile: a large connected load, a long cooling season, and a building that operates on a predictable schedule. Screw compressors hold efficiency well across part load, which matters in an office where the actual load on a Tuesday afternoon is rarely the design load.
Split air conditioners for the edges. Not every space belongs on a central loop. Rooms used outside normal hours, isolated technical spaces and areas where a central riser made no sense were served by split units. Running a 3,000 kW plant for one occupied room in the evening is a waste of energy and a waste of maintenance hours; a split unit handles that case with a fraction of the effort.
Zoning that follows how the building is actually used. Floors were grouped by function and orientation, so that a west-facing studio with afternoon solar gain is not treated the same as a north-facing archive. Zoning is unglamorous and it is where a lot of office buildings quietly lose their efficiency.
A plant of this size is judged over a decade, not a season.
The chillers carry the base load through the cooling season, with staging arranged so that machines run near their efficient range rather than cycling. In spring and autumn, when the building needs air movement and fresh air more than it needs full cooling, the plant runs at low load and the splits pick up the isolated rooms.
Maintenance is straightforward because the design is legible: a central plant that a site team can inspect and service in one place, plus distributed splits that can be attended to individually without shutting down a floor. For a public-facing building with limited technical staff, that simplicity matters as much as efficiency.
|
Metric |
Value |
|
Conditioned area |
20,000 m² |
|
Installed cooling capacity |
3,000 kW |
|
Cooling intensity |
approx. 150 W/m² |
|
Chiller type |
Screw, water-cooled |
|
Supplementary cooling |
Split air conditioners |
|
Year completed |
2019 |
|
Building context |
126,000 m² design-industry park |
|
Phase |
Activity |
|
1 |
Load calculation and system selection |
|
2 |
Chiller plant layout and pipe routing |
|
3 |
Equipment supply and site delivery |
|
4 |
Installation and pressure testing |
|
5 |
Commissioning and handover |
|
6 |
Operation and maintenance support |
Office buildings are the least glamorous part of the HVAC market and the place where most of the energy is actually spent. Three things from this project travel well.
Hybrid beats monolithic. A central plant sized for the whole building is efficient at peak and wasteful at 8 pm on a Friday. Splits cost little to add and save a lot of part-load waste. The question is not which system is better, it is which zones genuinely belong on the central loop.
Part-load performance is the real specification. A chiller is bought at design conditions and lives at part load. Screw machines suit offices for exactly this reason, and any tender that only compares full-load COP is measuring the wrong number.
Simplicity survives contact with the client. Buildings are operated by whoever is available, not by the design team. A plant that can be understood, inspected and serviced by a small site team will still be running properly in year ten.
The project was delivered with Midea commercial HVAC equipment through Hongtai, Midea's long-term export and project partner. Hongtai has more than 20 years of HVAC manufacturing and export experience, with CE, Eurovent, TUV SUD, SASO, ESMA, GCC and ISO 9001/14001/45001 certification, and equipment supplied to projects in more than 80 countries.
Send us the floor plans, the occupancy pattern and the local climate data. We will come back with a system split — what belongs on the central plant, what does not — and an honest view of the part-load performance you should be asking for in the tender.
Contact:
Sales Manager: Lisa
Email: xiaohongmao@unit-hvac.com
Tel: +86 187 0382 7920
WhatsApp: +86 150 2999 8850
WeChat: +86 187 0382 7920
Website: www.unit-hvac.com