Modularity changes how a chiller plant is specified. Instead of sizing one large machine for a peak load that occurs a handful of hours per year, this air cooled modular chiller adds capacity in 35 to 180 kilowatt modules, each with its own scroll compressor, its own condenser coil bank and its own control board. The plant is assembled from as many modules as the design load requires, and each module runs only when the aggregate demand calls for it.
For a building owner, the practical consequence is that the plant rarely operates at a poor part load point. Six modules serving a hotel will usually run two or three for most of the day, with the remainder starting in sequence as the load climbs. Because the refrigerant circuit is R410A and the supply is a standard 380-415V three phase feed at 50Hz, the electrical distribution and the pipework design stay conventional for the region.
| Parameter | Specification |
|---|---|
| Cooling Capacity per Module | 75-180 kW |
| Cooling Operating Range | 0 °C to 48 °C |
| Compressor | Scroll Compressor |
| Refrigerant | R410A |
| Power Supply | 380-415V / 3Ph / 50Hz |
| COP | 3.2+ |
| Sound Level | 70 dB(A) |
| Type | Air Cooled |
Modular chillers are specified for hotels, office buildings, shopping centres, hospitals and industrial facilities where the cooling load varies widely through the day and through the year. They are particularly useful in projects with a staged construction programme, because modules can be added as floors are handed over rather than installing the full peak load at practical completion. The format also suits sites where a single large chiller could not be lifted into position by the available crane.
Each module is shipped on an export pallet with the coil faces protected by a rigid shield, fan decks braced and refrigerant circuits charged and pressure tested. Lifting points are marked on the frame, and a lifting plan is issued with the first unit of each size. Water connections are flanged and capped, and the control terminal arrangement is documented so that the electrical contractor can terminate without opening the panel.
The argument for modular plant is operating cost, not capital cost. A staged plant spends most of its life running a few modules near full load instead of one large machine at a fraction of its capacity, and that difference shows up on the energy invoice every month.
| MOQ: | Negotiable |
| Price: | Negotiable |
| Standard Packaging: | Export standard |
| Delivery Period: | Negotiable |
| Payment Method: | TT |
| Supply Capacity: | Negotiable |
Modularity changes how a chiller plant is specified. Instead of sizing one large machine for a peak load that occurs a handful of hours per year, this air cooled modular chiller adds capacity in 35 to 180 kilowatt modules, each with its own scroll compressor, its own condenser coil bank and its own control board. The plant is assembled from as many modules as the design load requires, and each module runs only when the aggregate demand calls for it.
For a building owner, the practical consequence is that the plant rarely operates at a poor part load point. Six modules serving a hotel will usually run two or three for most of the day, with the remainder starting in sequence as the load climbs. Because the refrigerant circuit is R410A and the supply is a standard 380-415V three phase feed at 50Hz, the electrical distribution and the pipework design stay conventional for the region.
| Parameter | Specification |
|---|---|
| Cooling Capacity per Module | 75-180 kW |
| Cooling Operating Range | 0 °C to 48 °C |
| Compressor | Scroll Compressor |
| Refrigerant | R410A |
| Power Supply | 380-415V / 3Ph / 50Hz |
| COP | 3.2+ |
| Sound Level | 70 dB(A) |
| Type | Air Cooled |
Modular chillers are specified for hotels, office buildings, shopping centres, hospitals and industrial facilities where the cooling load varies widely through the day and through the year. They are particularly useful in projects with a staged construction programme, because modules can be added as floors are handed over rather than installing the full peak load at practical completion. The format also suits sites where a single large chiller could not be lifted into position by the available crane.
Each module is shipped on an export pallet with the coil faces protected by a rigid shield, fan decks braced and refrigerant circuits charged and pressure tested. Lifting points are marked on the frame, and a lifting plan is issued with the first unit of each size. Water connections are flanged and capped, and the control terminal arrangement is documented so that the electrical contractor can terminate without opening the panel.
The argument for modular plant is operating cost, not capital cost. A staged plant spends most of its life running a few modules near full load instead of one large machine at a fraction of its capacity, and that difference shows up on the energy invoice every month.